Feasibility Study
A Feasibility study is performed before any project is undertaken. The Feasibility study covers the following areas:
- To ensure that membrane treatment is a viable option for the application
- To ensure that membrane treatment offers a cost effective solution
Benchtop Treatability Study
The next stage in the process will likely be a benchtop treatability study.
- Benchtop studies offer an initial view of the process, using simulated pretreatment steps where required.
- Analytical work is carried out on raw and treated samples to ensure that the proposed process achieves the required quality of discharge.
- The study is carried out at low cost and allows us to formulate a preliminary process design for the application.
- This is presented to the owner along with a revised proposal for consideration. Assuming that this produces a cost-effective result, the project may proceed in a number of different directions.
- If the confidence levels of both the owner and Nordic Water LA in the proposed design are high enough, the project will proceed to a final process design and final proposal.
Pilot Treatability Study
If required, Nordic Water LA will install a pilot membrane treatment system at the project location in order to prove the proposed process or collect more information about operability.
- Nordic Water LA maintains a fleet of pilot systems, which can be modified for many applications
- Pilot studies are particularly useful for larger applications, or where variations in feed quality are anticipated.
- Equipment is shipped to the owner's site and set up typically using hoses to make installation and breakdown simple
- Some pilot systems are equipped with remote monitoring and control, which allows us to monitor the system performance from remote locations.